It's normal to want a new house, but it's also normal wanting to have it without living months amidst unforeseen events, dust, and last-minute decisionsThat's why more and more people are looking for the steps involved in building an industrialized house.
In Modular Home We work with industrialized concrete construction.We try to bring to the workshop what can be controlled, and leave only what's absolutely essential on-site. The result is a more predictable process, with clearer timelines and less room for error. Keep reading!
How to build a prefabricated house
Prefabricated or industrialized construction follows a different path than traditional construction. Instead of doing everything on-site, much of the work is done in a factory with a stable environment. This allows you to have Quality Control real about what is manufactured and checked.
At Modular Home, for example, we industrialize with concrete and work in 2D, in the form of panels. This makes sense when you're looking for transport efficiency, because transporting "3D modules" limits dimensions and can involve unsustainable journeys. With panels, assembly is done on-site, and the weather can have an impact there, but the core of the system arrives prepared and tested.
Stage 1: Project design and planning
Almost everything is decided here. Before anything is manufactured, You define what kind of housing you need and what makes it worthwhile for you..
This phase involves:
● The size of the dwelling and the basic model to start from.
● The interior layout and how you will experience each space.
● Adaptation to the terrain, taking into account access, orientation and regulations.
● The finishes and qualities, separating what is industrialized from what is finished on site.
Stage 2: Site study and technical project
Before building, it's necessary to check that the ground can support what you're going to build and that the project complies with regulations. This stage is what transforms an idea into a viable technical document, ready to apply for a permit and be implemented without improvisation.
Here, four main things are done. First, the geotechnical studywhich analyzes the soil type and determines how the foundation should be. Then, the basic and execution projectwhere plans, materials, and installations are defined. The urban planning regulations of your municipality are also reviewed to avoid surprises. Finally, the structural calculation.
This document is prepared by an architect and submitted for approval. At Modular Home, The industrialized concrete panel system provides certaintybecause it is based on solutions already defined and proven within our MH System.
Stage 3: Processing of licenses and permits
This is the least flashy part, but it's what keeps you on solid ground. An industrialized house needs the same permissions And it must comply with the same regulations as a traditional home. There is no legal loophole simply because it's manufactured in a workshop.
In this stage The building permit is being processed at the town hall and pay the corresponding urban planning fees. Also The project management is contracted and the execution direction, in addition to the health and safety coordinationbecause it remains a project with technical responsibilities.
One important point. If the land is rural, you typically won't be able to obtain a building permit for a "normal" house. And without a permit, there's no occupancy certificate, nor bank financing for a home. That's why at Modular Home, the focus is on projects with permits, where the entire process is streamlined. real feasibility.
Stage 4: Factory manufacturing of the house
This is where industrialized construction makes the difference. Instead of relying on the pace of traditional construction, much of the work is done in a factory, with repeatable processes and constant monitoring. That gives you greater accuracy and reduced errors which are then expensive to correct on the plot.
In this phase, the main elements of the house are manufactured, such as the structure, the enclosures and the construction pieces that will later be assembled on site. At Modular Home we talk about concrete panels, not complete 3D modules.This makes sense in terms of weight and logistics, because it makes transport more efficient and allows for sequential assembly on site.
Stage 5: Plot preparation
While at the factory The panels and elements of the house are manufacturedEverything on the site is prepared to receive them. This phase is key to ensuring a smooth assembly process and preventing delays due to poorly executed preliminary work.
These jobs are usually done here:
● Earthmoving and land leveling.
● Execution of the foundation, according to the geotechnical study and the project.
● Preparation of water, electricity and sanitation connections and services.
● Access for trucks and cranes, designed with maneuvering and safety in mind.
Stage 6: Transport and assembly of the house
Once the components have been manufactured, The time has come to take them to the plot and assemble the house. The process usually includes:
● Transport of panels and parts, with routes and means adapted to the weight.
● Unloading and placement with crane according to the assembly sequence.
● Structural assembly and joint sealing.
● Connection of planned installations and final closures of the envelope.
Stage 7: Final touches and revisions
Once the structure is assembled and the enclosure is closed, It's time to get the house ready to live in.This is where the components that don't make sense to fully industrialize are finalized, and everything is checked to ensure it functions correctly. It's the phase where you notice the difference between a quick assembly and a well-executed project. finished.
At this stage, the following are done carpentry adjustments and finish checksElectrical and plumbing installations are completed, pressures, flow rates, control panels and mechanisms are checked, and sensitive points such as seals and possible air leaks are inspected.
Stage 8: Home Delivery
You've reached the final stretch. The house is now assembled, checked, and ready for final handover. This stage is what gives you legal peace of mind. and it allows you to move in with everything in order.
Here the process concludes with the final work certificate, signed by the project management teamAccording to the municipality, the first occupancy license or equivalent document is also processed, which certifies that the dwelling conforms to the approved project and the regulations.
In parallel The technical documentation is being prepared.This includes manuals, warranties, final drawings, and installation details. A final review is then conducted with you to check finishes, functionality, and any minor adjustments.
Advantages of this process compared to traditional construction
When construction follows an industrialized method, The change is noticeable in how the project is progressing.You go from a project that depends heavily on day-to-day operations to a more organized process, where each phase has a function and is better controlled.
● Shorter and more predictable timeframesbecause manufacturing and construction overlap and assembly follows a clear sequence.
● Greater quality controlsince much of the work is done in the factory with constant checks.
● Less unforeseen eventsbecause the project is more closed from the design stage and with fewer decisions made during construction.
● error reductionbecause the system is based on repeatable and proven processes.
● Less waste on the plot, with better use of materials and a cleaner construction.
● Better energy efficiency, when designing the building envelope to comply with regulations and avoid thermal bridges.
● More technical certaintyespecially in industrialized concrete systems.
This is how an industrialized house is built step by step
If you're looking for a solid home, with clear deadlines and a system designed to minimize errors, Industrialization suits youAnd if you're also interested in concrete for its durability and final finish, this is where Modular Home makes the difference.
In Modular Home We manage each phase with our own method, the MH SystemAnd a level of industrialization that goes beyond simply manufacturing "parts" in a workshop. We design to manufacture, and we manufacture to assemble with precision.