Once you sign the purchase contract for your modular or prefabricated home, the next step is to start imagining your life there. Of course, it's all dreams and big plans, but… Days go by and the terrain is exactly the same. You wonder if something should be happening.
And the answer is that Yes, even though you can't see it yet. Because before building a modular or industrialized house, there are countless technical decisions, permits, and coordination that need to be addressed.
At Modular Home we specialize in building industrialized homes using 2D panels, so today we can tell you all about it in detail. What happens from the time you sign the contract until you receive the keys?
If you're still considering land and budgetStart with our step-by-step guide on how to build a modular home. Let's get started!
What happens right after signing the contract
The first thing we'll do after you sign your contract is to check What is already closed and what still needs to be resolvedIt's not the same if you've already booked, if the project has been commissioned, or if there's a signed construction contract.
Final definition of housing
Defining a home involves establish a specific layout and materialsBut it also specifies the finishes, carpentry, and technical details such as climate control. This prevents minor changes and avoids having to replace pre-made pieces.
Development of the technical project
At Modular Home, we develop all our projects using BIM. In this process, we ensure that architecture, structure, and building services are coordinated before manufacturing. Learn more What professionals are involved in the construction of a house? It helps to understand who validates each decision.
Licenses and preparation to begin construction
Even if we organize everything before signing the contract, in order to carry out the work, we need a series of absolutely essential authorizationsDon't worry, we'll help you with everything you need so you don't experience the typical "bureaucratic confusion".
Procedures and permits
Your new industrialized home It requires an architect to sign off on the project beforehand.After this, a building permit is required. Keep in mind that administrative deadlines are not always the same; they depend on the municipality and the documentation you need to provide.
Preparation of the land
Before construction begins, access roads must be prepared, the planned earthworks carried out, and all utility connections made ready. In each case, The leveling will have to be adjusted to the projectIt might be worth flattening the entire plot... or it might not.
Foundation construction
The foundation must always be laid as dictated by the project and the geotechnical studyThis is because all measurements, dimensions, and supports must allow for subsequent assembly. If maximum precision is desired, everything must be done well before the first panel is installed.
How to build a modular home
Housing is progressing through processes that must be defined beforeThanks to this preparation, we can monitor production using repeatable criteria and prevent these tasks from being exposed to the weather.
Fabrication of the structure and enclosures
In Modular Home We use MH System®Based on load-bearing concrete walls, we manufacture 2D panels according to the specifications and assemble them on-site. The finish can be left exposed, depending on the design, without necessarily adding another exterior cladding.
Installations and finishes
Our interior industrialization includes non-load-bearing partitions and factory-prepared wall linings, with insulation and piping according to the project. The previous work in BIM defines the position of the connections. Electricity, plumbing and other installations then require their connections and checks on site.
Quality controls during manufacturing
It is essential to thoroughly check that all materials and workmanship are as perfect as possible. If deviations are detected before transport, they can be corrected, preventing problems during subsequent assembly. Generally speaking, It is much more cost-effective to review everything beforehand rather than afterward.
What happens while the house is being built
The construction of the plot can progress simultaneously in several ways. The most common are the foundation work and the preparation of access roads. By working simultaneously we can make better use of the calendarprovided that the work is well coordinated and properly authorized.
DISCOVER What are the phases of construction of a modular home? It helps you understand which tasks can overlap and which need to wait.
Transport and assembly of the house on the plot
This is undoubtedly the most striking phase of allUltimately, it's exactly what you've been seeing in blueprints for months, only now it's starting to take on real volume.
Transport of the modules
Before taking the modules We need to review the route, weight, access, maneuvers, and necessary permitsSince we transport panels, we can take advantage of the load without moving empty rooms.
Modular house assembly
The panels are lifted by crane and placed on their supports; then the joints and connections are completed. The sequence includes stability and position checks. This phase takes place outdoorsTherefore, you must always keep in mind that wind or rain can affect the process.
What remains to be done after assembly
We know you can already imagine this, but Having the structure up does not mean the house is finished. Not even close. In fact, even though you see a large and imposing house before your eyes, several of the most crucial phases of construction are still missing.
Connections and terminations
By the time the house is built, it is normal for there to still be connections of installations, seals, junctions between elements, facades and finishes. These services complement and ensure the proper functioning of your home. Therefore, it is worth valuing them for what they solve, even if they are less visually appealing.
Exterior work
This will depend on the scope of what you have contracted, but We are usually talking about elements such as a swimming pool, a garden, paving, and fencing.Some of these elements affect delivery. while others are less of a priority and have independent planning. Of course, not all exteriors are included by default.
Final inspections before handing over the property
In a final review we verified that Both the appearance and the actual functioning of the house are in perfect conditionThis includes two completely different elements:
● Final inspection of installations and finishes: Electricity, plumbing, air conditioning, carpentry and finishes are checked.
● Documentation and final procedures: Certificates and technical documentation are gathered, and the applicable occupancy and supply procedures are completed.
How long does it take from signing to delivery, and what can delay it?
To calculate How long does it take to build a modular home?Ask from which milestone the contracted period begins and what conditions must be met to maintain it. This information is more useful than a date without context.
Please note that administrative delays, late changes, soil issues, difficult access, and added exterior elements may postpone delivery. In these cases, knowing the mistakes that delay the construction of a house helps to anticipate them.
Build your home with Modular Home
At Modular Home we use our own system, MH System, which we continue to research and improve every dayStandardized customization is our hallmark, as it allows us to adapt the home to specific and ideal solutions for each project.
If you want to know the scope and conditions of your future home, contact Contact our team and request information for your project.