How to build a modular home step by step

Do you want to know more about our houses?

Table of Contents

At this point, you should already have a pretty clear idea How would you like to live in your own house?You want plenty of light, a quiet office, or a living room with enough space to move around freely. The problem arises when, after these certainties, a multitude of doubts emerge.

Do I have to buy the land first? What should I expect from a quote? How long will it take until I finally get my keys? All these questions inevitably arise.Because this is not as simple as choosing a home from a catalog and sitting back and waiting.

Luckily, at Modular Home we specialize in answering all these questions and helping you build your own industrialized housingWe help you plan everything and manufacture all those components that we will then assemble on the plot.

Today we tell you How to build a modular house step by stepThis will help you organize your decisions and priorities. We'll go from the initial idea to that first happy night at home. Let's begin!

What you need before you start building a modular home

You don't think that to start building a modular home you need to arrive with all the plans drawn up. That said, It will help you a lot to have a base to start working on.. This may include:

● A realistic overall budget that you have available, including land and associated expenses.
● A location you like and details of the plot, if you already have one.
● Approximate area in which you wish to live, as well as a summary of your family needs and lifestyle.
● Savings and financing you need to study.

When you know exactly what you need before requesting a quote, you can have a first conversation that goes beyond having a indicative priceIt helps a lot to have concrete information at hand, because that way we can verify that what you want to build fits with your investment possibilities.

Step 1. Define what your future home will be like

A good way to define your dream home is Imagine what a normal day would be like from the moment you wake up until you go to bed. Think about that breakfast nook, whether someone in your family or you yourself are working remotely, and other small details such as how you use storage or outdoor spaces.

Thus, You can define your bedrooms, bathrooms, or floors without needing to add more square footage than necessary.In addition to avoiding the risk of running short, keep in mind that spaces like garages or gardens are part of the project, but their impact on the budget is different.

Finally, and although we know it is a difficult exercise, Think about energy efficiency and the needs your family will have in the future.Because an accessible bedroom may not be very useful now, but it will be in a few years.

Step 2. Find and study the terrain

Although it may seem so, Having a large plot of land does not mean that your house will also be large. Before making a purchase, it's crucial to check the zoning regulations and permitted uses. Of course, you should also verify that the land is buildable and check regulations such as maximum height limits.

Other key elements are orientation, access, slope and the actual possibility of connecting suppliesKeep in mind that you will need a geotechnical study that provides the necessary information for foundation construction.

All this, Although it may seem different at first glance, it is totally relatedBuilding capacity sounds like something too technical, but it often makes the difference between having the house of your dreams or settling for something that isn't what you wanted.

Step 3. Request an initial quote and assess the feasibility

Once you have all the details of the property and know which plots to build on a first assessment can be preparedThis is where we see the surface to be built with its finishes and extra elements.

The first thing to do is compare quotes for similar scope. The best advice we can give you is that A low number can be interesting until you discover everything it's missing. For that, it's best to know how to read a construction budget and make sure it has all the necessary conditions to make it worth accepting.

Step 4. Design the house and develop the project

Thanks to a good preliminary design, different layouts can be tested, both of the house on the site and of its various interior spaces. Once the best layout has been selected, The necessary documentation to carry out the work is prepared.which includes structure and materials, among other things.

It's the perfect time for working on important details such as orientation or natural lightingwhich will have a huge impact on energy efficiency and air conditioning.

Yes, we can put in a huge and beautiful window, but it will have to be adapted so as not to turn the house into an oven during the summer.

To ensure everything turns out as you imagine, at Modular Home we work with BIM technology to coordinate all the architecture, structure, and installations before manufacturing. This allows us to: reduce those distressing moments in the work which require rethinking everything and looking for alternative solutions.

Step 5. Process licenses and permits

A permanent prefabricated home requires a project plan signed by an architect and the corresponding building permits. Manufacturing off-site does not eliminate the obligations of the Building Regulations Act.

The process includes obtaining the building permit, technical documentation, and applicable fees. Depending on the location and the work involved, other government agencies may be required, or additional permits may be necessary.

Residential use should not be assumed on rural land: exceptions depend on regional legislation, planning regulations, and required permits. A mobile installation is also not an automatic shortcut. Municipal processing times vary, so it's advisable to separate the application process from the implementation phase.

Step 6. Sign the contract and finalize the project terms

Before getting started, the following must be defined the following aspects:
● Quality specifications
● Final price
● Payments (installments or cash)
● Responsibilities
● Delivery conditions

Of course, It's important that you have identified which document you are signing. and what commitments each one activates. Something that always brings peace of mind to self-builders is knowing how long each milestone lasts and what circumstances might alter it. The goal is to know What happens from the moment you sign the contract until you receive the keys?.

Step 7. Prepare the ground and lay the foundation

Before receiving the property, The plot must be completely finished.It is common for there to be an excavation, with earthmoving and access for heavy machinery.

Then comes the time to lay the foundation, for which Copying the one from a nearby house won't work.since each project has its own conditions and necessary scope.

Step 8. Build the house

This is where we observe the biggest difference between a traditional home and one built industrially. Most of the process takes place in a factory.Therefore, all design and production is carried out with information already defined beforehand.

In Modular Home, MH System® uses 2D concrete panels These are assembled on-site. We don't transport complete three-dimensional rooms. This solution allows us to utilize cargo space without moving the empty volume of the rooms' interiors.

We also manufacture non-load-bearing interior partitions and wall liningswith the insulation and installation requirements defined for each solution. Interior industrialization prepares elements in the factory that would otherwise require more work and site layout.

Direct production control allows for verification of materials, dimensions, and finishes. Some panels may offer an exposed concrete exterior finish. Naturally, assembly, joining, and other work continue to be carried out outdoors.

Step 9. Transport and assemble the modules on the plot

After looking at blueprints for weeks, Then comes one of the most visual and also most beautiful moments of the processObserve how the elements of the house begin to take their place on the land.

What isn't always visible is how extensively the entire transport route, access, maneuvers, and crane positioning have been studied beforehand. In a panel system like ours, The pieces are lifted and placed according to the projectwhich allows all supports and joints to be resolved quickly and reliably.

At this point, most people who watch their house being built stay amazed at how quickly the plot of land changesOf course, this is the result of everything that has been decided beforehand.

Step 10. Carry out installations, finishes and final work

We know that seeing a structure already built generates excitement and a desire to start moving in. However, a large part of the work remains in terms of connections and finishes.

Furthermore, it is important to understand that Concrete provides mass and thermal inertia, but it does not replace insulation.At Modular Home we combine a 12 cm concrete wall with an air chamber, reflective layer, XPS insulation and plasterboard.

Understand What are the phases of construction of a modular home? This helps to interpret the actual progress. Although the exterior volume may be very advanced, it is normal that essential interior work is still needed to make the house habitable.

Step 11. Inspect the property before delivery

A final inspection checks that all the finishes are correct and A review is made of the electrical installation, plumbing, air conditioning and general operationIt's time to perform a quality control check to find any potential defects.

On the final visit, As the new owner, you will be able to tour the rooms and make sure our team records the issues correctly. In these cases, it's much more helpful to identify a window that isn't closing properly than to write a generic "check windows and doors."

Step 12. Handover of keys and entry into the home

The moment of delivery It goes far beyond receiving some keysA large number of documents need to be managed, including construction reports, certificates, and instructions for use and maintenance.

are also necessary certain permits such as the certificate of occupancy or the first occupancy titleHowever, normally this is processed in the previous months and is already managed at the time of receiving the keys.

As a final piece of advice, always ask them to explain the facilities point by point, how to regulate the air conditioning or maintain ventilation to give your home the care it needs.

How long does it take to build a modular or prefabricated house?

The total construction time for a modular or prefabricated house depends on many factors, including:

● Design
● Size
● Personalization
● Land
● Financing
● Licenses
● Logistics and outdoor work.

Therefore, even if they give you an approximate date, it's almost impossible to calculate when you'll actually move in. On the other hand, building a prefabricated house significantly reduces the construction time, allowing you to enjoy your home much sooner than you imagine.

Request a plan that outlines milestones and pending decisions, not just a final date. To estimate how long it takes to build a modular home, the first step is to know when the timeframe begins and what tasks are included within that timeframe.

Which professionals are involved throughout the entire process

Architects, building engineers, geotechnical and surveying specialists, engineers (where applicable), construction companies, manufacturers, and installers participate. The project management and construction management teams oversee their respective areas.

You don't need to coordinate every trade personally, but you do need to know who answers your questions and who approves changes. Knowing which professionals are involved in building a house makes it easier to understand why a seemingly minor decision might require several checks before being approved.

Mistakes that can delay the construction of your home

Some problems begin long before the machinery arrives:

● Buy without checking the building regulationswhich may require rethinking the housing.
● Calculate only the price of the house, which leaves essential expenses unfunded.
● Postpone fundingwhich almost always creates a mismatch in the planned payments.
● Changing the distribution with advanced manufacturingwhich requires reviewing work that has already been completed.
● Submitting documents latewhich will always interrupt procedures and delay decisions.
● Choose based solely on price.which makes it difficult to compare benefits and responsibilities.

Understanding these mistakes that delay the construction of a house It allows you to act before they seriously affect delivery deadlines. With good planning, you can make timely decisions as the owner.

Build a modular home with Modular Home

At Modular Home we are a construction and technology company applied to industrialized homes. MH System® brings together solutions developed and controlled in the factoryWith technical documentation and quality certificates, allowing for customization on a known basis. Each project still requires its own specific checks and documentation.

Research continues in both interior industrialization and materials. We are making progress in research, with innovations such as our work in bioconstruction using industrial hemp.

Modular Home's unique value begins with understanding your needs and the possibilities offered by your plot of land. From there, we can define the scope of your project and guide you through the decision-making process. Contact Modular Home and tell us about your vision for your home. We'll analyze your starting point to move forward with clear information.

FAQ

What is the first thing I need to build a modular home?

The first step is always to define your needs and overall budget. Then, check the feasibility of the plot of land before committing to a purchase or finalizing the design.

Do I need to own land before requesting a quote?

You can request guidance without having it, but you will need to have a defined plot of land in order to specify foundations, access, connections and urban adaptation.

Does a modular home require a building permit?

Yes. A permanent dwelling needs the corresponding urban planning authorizations, even if it is partially built outside the plot.

How long does the entire construction process take?

It depends on the project and the permitting process. The manufacturing time is only one part of the journey to the final installation in your home.

Can a modular home be customized?

Yes, within the constraints of the construction system, regulations, and budget. It's advisable to finalize the changes before starting manufacturing.

Subscribe to our Newsletter

Get in touch to find out more

Ready to Start Building Your Dream Home?

With Modular Home you will have the best construction experience of your new house. Tell us about your project and we will offer you complete advice.